Locations · Vietnam · Nam Phu Yen Economic Zone
Nam Phu Yen Economic Zone data center site: 300 MW
Nam Phu Yen Economic Zone is a 300 MW PacinfraX data center site on the south-central coast of Vietnam, under a signed agreement with a company of BIN Corporation. It serves AI labs, neoclouds and enterprises placing GPU capacity in Vietnam.
Page updated
Nam Phu Yen Economic Zone key facts
- Location
- Nam Phu Yen Economic Zone
- Planned capacity
- 300 MW
- Setting
- Economic zone, south-central coast
- Agreement
- Signed with a BIN Corporation company
About the site
Why an economic zone suits data center growth
Nam Phu Yen is the second-largest site in the Vietnam program at 300 MW. It sits inside an economic zone on the south-central coast, and the site agreement is signed with a company of BIN Corporation.
Hall sizes and phasing are scoped with the first tenant, so the plan follows your load rather than a fixed template.
300 MW, economic zone setting and phasing
- 300 MW planned in Nam Phu Yen Economic Zone.
- Economic zone setting on the south-central coast.
- Phasing scoped with the first tenant.
Fit
Who Nam Phu Yen is for
Choose Nam Phu Yen if you want capacity inside an economic zone. At 300 MW it sits between the lead campus and the largest site in scale, and it suits AI labs and neoclouds building a south-central presence.
Planning across sites is simple: the same reference hall and one point of contact cover all four locations.
Inside an economic zone
What being inside an economic zone means for a tenant
Photo: crews on a campus site
Nam Phu Yen is inside an economic zone, so the site sits within a defined industrial setting rather than on stand-alone land. For a tenant, the practical effect is on process: who you deal with, and in what order the site steps happen.
You deal with PacinfraX. We coordinate with our site partner and the zone around the site, and we bring the results into one design package, so your team reviews a single set of drawings and a single schedule. The order of site steps is set with the first tenant, and we confirm it in writing before design is fixed.
One counterpart, one package and written sequence
- One counterpart. Your team works with PacinfraX across site, power and hall design.
- One package. Hall, power and delivery milestones in a single proposal.
- Written sequence. The order of site steps confirmed before design is fixed.
Send your load and timeline through Request capacity and we confirm the sequence for your hall.
Power planning
Power planning is scoped per site with the tenant
Each Vietnam site has its own conditions, so the power plan for Nam Phu Yen Economic Zone is scoped with the tenant. You share your load, timeline and cooling method, and our team confirms the power approach for the hall you choose before design is fixed. Read the principles on data center power infrastructure.
Photo: transmission towers

Status and timeline
How Nam Phu Yen Economic Zone comes online
-
Done
Site agreement signed
Signed with a company of BIN Corporation, announced 30 October 2026.
-
Next
Site planning
Hall sizes and phasing are scoped with the first tenant.
-
Next
Phased delivery
Blocks are built and energized as tenant demand is confirmed.
The Vietnam program
Nam Phu Yen Economic Zone in the 1,200 MW program
PacinfraX Vietnam has four signed sites, announced on . Read the announcement.
Diagram: the four Vietnam sites
Compare with the other sites: Nam Thang Binh, Dak Lak (Ea Wer), Dinh An. See the full Vietnam overview.
Delivery and next steps
Delivery models and how to engage
Build-to-suit, powered shell and AI colocation are all available here: see the delivery models and what to bring to the first call. We reply within two business days. EPC firms, suppliers and land partners can partner with us; meet the leadership team or read why PacinfraX.
Photo: engineers walking a site

Questions
Nam Phu Yen Economic Zone data center FAQ
How large is the Nam Phu Yen data center site?
The site is planned at 300 MW within Nam Phu Yen Economic Zone.
What is the Nam Phu Yen Economic Zone?
It is an economic zone on the south-central coast of Vietnam. PacinfraX holds a signed site agreement there with a company of BIN Corporation.
How will Nam Phu Yen be powered?
Power planning is scoped per site with the tenant. Share your load and timeline and our team confirms the power approach for your hall.
Which delivery models are available?
Build-to-suit, powered shell and AI colocation, all using the same liquid-cooling-ready reference hall.
2 more questions
When will the first hall be ready?
Dates are set with the first tenant. The dated phase in the Vietnam program is Nam Thang Binh phase 1, targeted 2026–2027.
Can I combine Nam Phu Yen with another Vietnam site?
Yes. All four sites share one reference design, so you can place phases across sites with one design review.
Reserve capacity at Nam Phu Yen.