Dinh An data center site in Vinh Long province: 200 MW
Dinh An is a 200 MW PacinfraX data center site in Vinh Long province, in the Mekong Delta of southern Vietnam, under a signed agreement with a company of BIN Corporation. It is planned for enterprises, neoclouds and AI labs that want capacity in the south of the country.
Page updated
Dinh An key facts
- Location
- Dinh An, Vinh Long province
- Planned capacity
- 200 MW
- Region
- Mekong Delta, southern Vietnam
- Agreement
- Signed with a BIN Corporation company
About the site
Why Dinh An serves southern Vietnam
Dinh An brings the Vietnam program to the south. The site is in Vinh Long province, in the Mekong Delta, and the site agreement is signed with a company of BIN Corporation.
At 200 MW it is matched in size to the lead campus at Nam Thang Binh, which makes it a natural second location for teams that want two regions inside Vietnam.
The hall design is the same as at every PacinfraX location: separate A and B power feeds, a liquid-cooling-ready floor plan, a carrier-neutral network room and layered security. Your engineers review it once, then apply it at Dinh An and at any other site you add.
200 MW, vinh Long province and phasing
- 200 MW planned at Dinh An.
- Vinh Long province in the Mekong Delta.
- Phasing scoped with the first tenant.
Fit
Who Dinh An is for
Choose Dinh An if your users, teams or partners sit in southern Vietnam. It suits enterprises and neoclouds that want a southern footprint, and AI labs that want a second region.
Pairing Dinh An with Nam Thang Binh gives you capacity in two regions under one design review and one point of contact.
Two regions
Pairing Dinh An with Nam Thang Binh to cover two regions
Nam Thang Binh in Da Nang and Dinh An in Vinh Long province are both 200 MW sites, in different regions of Vietnam. Taken together they let one tenant place capacity on the central coast and in the Mekong Delta under one plan.
A typical pairing starts at Nam Thang Binh, where phase 1 delivers 20 MW of IT load, targeted 2026–2027, and adds Dinh An as the second region as demand grows. Both sites use the same reference hall, so your engineers review it once. You keep one design review and one point of contact across both.
Region one, region two and one plan
- Region one. Nam Thang Binh, Da Nang: the earliest dated phase.
- Region two. Dinh An, Vinh Long province: the second region, phased with the first tenant.
- One plan. Shared reference hall, one design review, one counterpart.
Tell us which regions matter to your users and partners when you request capacity.
Photo: Vietnam industrial coast

Power planning
Power planning is scoped per site with the tenant
Each Vietnam site has its own conditions, so the power plan for Dinh An is scoped with the tenant. You share your load, timeline and cooling method, and our team confirms the power approach for the hall you choose before design is fixed. Read the principles on data center power infrastructure.
Photo: power control desk

Status and timeline
How Dinh An comes online
-
Done
Site agreement signed
Signed with a company of BIN Corporation, announced 30 October 2026.
-
Next
Site planning
Hall sizes and phasing are scoped with the first tenant.
-
Next
Phased delivery
Blocks are built and energized as tenant demand is confirmed.
The Vietnam program
Dinh An in the 1,200 MW program
PacinfraX Vietnam has four signed sites, announced on . Read the announcement.
Diagram: the four Vietnam sites
Compare with the other sites: Nam Thang Binh, Dak Lak (Ea Wer), Nam Phu Yen Economic Zone. See the full Vietnam overview.
Delivery and next steps
Delivery models and how to engage
Build-to-suit, powered shell and AI colocation are all available here: see the delivery models and what to bring to the first call. We reply within two business days. EPC firms, suppliers and land partners can partner with us; meet the leadership team or read why PacinfraX.
Photo: team reviewing plans

Questions
Dinh An data center FAQ
How large is the Dinh An data center site?
The Dinh An site is planned at 200 MW.
Where is Dinh An?
Dinh An is in Vinh Long province, in the Mekong Delta of southern Vietnam.
Who is the partner at Dinh An?
The site agreement is signed with a company of BIN Corporation.
How will Dinh An be powered?
Power planning is scoped per site with the tenant. Share your load and timeline and our team confirms the power approach for your hall.
2 more questions
Can I run liquid-cooled GPU racks at Dinh An?
Yes. Halls are designed liquid-cooling ready, as build-to-suit, powered shell or AI colocation.
Can I pair Dinh An with another Vietnam site?
Yes. All four sites share one reference hall, so you can place phases in two regions with one design review.
Reserve capacity at Dinh An.
Tell us the load you need, your timing and your fit-out model. We reply within two business days.