Resources

AI data center guides for buyers and partners

Ten practical guides, written by the team that develops and operates the campuses, that take you from first question to signed requirement: how to choose between colocation, build-to-suit and powered shell, how to size 50 MW, how power-first development works and how to cool dense GPU racks. Each guide shows the steps, the checklists and the questions to ask any provider.

Where to start

Pick a guide by your role

Match the row that describes you. Each path takes two guides and about twenty minutes, and every guide links onward to the next one you will need.

If you are…Start withThen read
Buyer with a defined requirementWrite an RFPSize your MW
Team with servers to relocateMove into colocationCheck cooling
Buyer comparing delivery modelsCompare modelsTest the power path
Landowner or EPC partnerUse the checklistAlign terms

How to use these guides

From reading to a requirement

  1. Read the model guide. Decide whether colocation, build-to-suit or powered shell fits your megawatts and deadline.
  2. Size your load. Use the 50 MW arithmetic with your own rack density and PUE.
  3. Check power and cooling. Confirm the power path and the cooling method your hardware needs.
  4. Write the requirement. Put the answers into an RFP so each provider bids on the same basis.
  5. Talk to us. Send the requirement through Request capacity; we reply within two business days.

Every guide ends with a short section on how PacinfraX approaches the topic, so you can see our method next to the general advice and judge it against other providers. If a guide leaves a question open, write to us and we will answer it directly.

Prefer to see the services first? Visit AI and GPU colocation, AI data centers or our locations.

FAQ

About these guides

Are these guides specific to PacinfraX?

They are written for any buyer, and each one ends with a short section on how PacinfraX approaches the topic. The method and checklists apply whichever provider you choose.

Can I copy the checklists and templates into my own documents?

Yes. The inventory table, the RFP guide and the site selection checklist are written to be reused. Adapt the inputs to your own requirement.

How current is the content?

Every guide shows its update date at the top. We review the guides when our services, campuses or industry practice change.

How do I choose between colocation and build-to-suit?

Start from your megawatts and deadline. Colocation is fastest for a defined cluster, and build-to-suit suits dedicated blocks of 10 MW or more. The model comparison guide includes a decision table you can apply to your own situation.

What should I bring to a first conversation with a provider?

Bring your load, timeline, preferred market, delivery model and cooling method. The RFP guide and the 50 MW sizing guide help you put numbers on each item before the call.

Who do I contact if I want a guide on another topic?

Write to [email protected] with the topic. If you want to discuss a requirement instead, use Request capacity and we reply within two business days.

Ready to put a number on your requirement?

Tell us your load, timeline and preferred market. We reply with the location, power path and block size that fit.