South ERCOT, Texas
An AI campus in development with on-site gas generation and storage, planned so halls energize without waiting on the interconnection queue.
Explore the Texas campus →Solutions · AI Data Centers · Build-to-suit
A build-to-suit data center is designed to your specification and delivered ready to operate. PacinfraX secures the land and the power, builds to your basis of design, commissions every system and hands over a hall that matches your cluster, in 10–50 MW blocks.
Updated
1,200MW
Planned in Vietnam
4
Site agreements in Vietnam
10–50MW
Hyperscale block size
3
Markets: Texas, Minnesota, Vietnam
Who it's for
Build-to-suit fits teams that know the cluster they want and want it built once, built right and delivered with power. It suits customers who need control over density, cooling and redundancy, and who prefer to commit capital to compute rather than construction.
Training clusters with a fixed design standard, repeated across blocks and campuses.
Large, anchor-tenant halls where the facility has to match a specific GPU platform.
Dedicated capacity for private AI platforms, delivered by a team that handles the construction.
Prefer to fit out the interior yourself? Read about the powered shell model.
What you get
Floor loading, ceiling height, rack layout and containment follow your drawings, not a generic template.
On-site generation and storage are part of the campus design, so the hall and its supply are delivered together.
Direct-to-chip liquid loops, coolant distribution and air-cooled zones sized to your GPU platform.
N+X for power and cooling agreed at basis of design, with maintenance paths built in.
Land, power, design, construction and commissioning sit with one accountable team.
Block one becomes the pattern for blocks two and three, which shortens each later build.
How we deliver
Next
We agree load, density, cooling, redundancy and handover standard with your engineers and write them into one document.
Next
We confirm the campus, lock the power plan and run the permitting path for the building and the plant.
Next
Architects and engineers produce drawings that follow the basis of design, with your review at set points.
Next
Civil works, steel, power plant and halls proceed in parallel, with progress reported against one schedule.
Next
Power, cooling, controls and security are tested together before the hall is offered for handover.
Next
You receive a commissioned hall, the as-built record and a plan for the next block.
Delivery phases
The schedule shortens because the power plant and the data hall are built side by side. Generation, storage and switchgear reach commissioning at the same time as the first hall, which lets the first block energize while later blocks are still under construction.
See how this works for the supply side on bridge to grid.
Control
You decide the things that define your cluster. We deliver the things that must be built, permitted and commissioned around it.
| Area | You decide | PacinfraX delivers |
|---|---|---|
| Capacity | Megawatts, block size and phasing | Campus plan that scales in 10–50 MW blocks |
| Density and cooling | Rack density, loop temperatures, cooling approach | Plant, piping, manifolds and controls sized to match |
| Redundancy | N+X target for power and cooling | Electrical and mechanical topology to meet it |
| Layout | Rack rows, containment, network meet points | Hall shell, floor, overhead routes and cable paths |
| Security | Access policy for your zones | Perimeter, controlled doors and monitored entry |
| Schedule | Target energization date | One integrated program from permits to handover |

Build-to-suit or powered shell
Both models start from the same campus and the same power plan. The difference is how much of the interior each side delivers.
Design basis
The basis of design is a short document both sides sign before detailed design starts. It records the choices that are expensive to change later.

Commissioning
Commissioning proves the hall works as one system. Electrical, mechanical and controls teams test each system alone, then together, with your representatives present for the tests that matter to your cluster.

Where available
Pick the market that fits your latency, customers and timeline.
An AI campus in development with on-site gas generation and storage, planned so halls energize without waiting on the interconnection queue.
Explore the Texas campus →
Minnesota, powered industrial site.
Explore the Minnesota site →
1,200 MW planned across four sites. Nam Thang Binh, Da Nang leads with 200 MW and a 20 MW phase 1 targeted for 2026–2027.
Explore Vietnam sites →Next step
Send us your megawatts, target date and preferred market. We reply within two business days, then follow with a matched site, a power plan and a written summary of the next steps. For a wider view of our offer, see AI data centers or why power-first delivery matters.
FAQ
A build-to-suit data center is designed and built to one customer's specification. The developer secures land and power, builds the facility and hands over a commissioned hall.
In a build-to-suit we deliver the finished hall. In a powered shell we deliver the building and the power, and you fit out the interior.
You decide density, cooling, redundancy and layout. We deliver the permitting, construction and commissioning around those decisions.
We design hyperscale blocks in 10–50 MW increments. You can start with one block and add more on the same campus.
Yes. Halls are liquid-cooling-ready, with direct-to-chip loops and coolant distribution planned from the first drawing.
The campus runs on on-site natural gas generation with battery storage, and a grid connection follows as a bridge. Your hall sees one supply throughout.
South ERCOT, Texas, where an AI campus is in development; Minnesota, powered industrial site; and Vietnam, with 1,200 MW planned across four sites.
You operate the hall or agree a services scope with us. The campus plan keeps the next block ready to follow.
Request capacity
Tell us how many megawatts you need, where and when. We come back with a site, a power plan and a delivery schedule.
Request capacity or write to [email protected].
One form, one team. Requests go through our contact page and reach the capacity team directly.
Request capacityPower-first AI capacity
Request capacityTalk to PacinfraX
We reply within two business days. WhatsApp and email work at any hour.